Enviornmental & Bio-Engineering Lab.

Enviornmental & Bio-engineering Lab units offer enhanced products for studying and analysis in environmental and Bio-technology disciplines. The goal is to provide these units fully with modern technical equipment allowing them to hold deep analysis including pollution control, waste management, and sustainable development studies. Specially made for absolute efficiency and accuracy they are suitable for various experiments including water testing or soil testing. These Enviornmental & Bio-engineering Lab units provide the versatility and modularity intended to suit the requirements of biomedical research. 

TRANSIENT DRAINAGE PROCESSES IN STORAGE RESERVOIRS

Description: Functioning of a sugar chamber 1."Rainwater retention basin "experiment, rectangular weir as gate 2."Consecutive storage reservoirs" experiment, rectangular weir as overfall weir 3."Surge chamber" experiment: transparent pipe as surge chamber in drainage line of basin 4. Gate in the drainage line for generating water hammers 5. Pressure sensors at both basin and the surge chamber capture the pressure fluctuations 6.Respresentation of the pressure curves and course of the water levels with software 7.Data acquisition software and full accessories 8.The necessary technical data will be provided to standard.

Coagulation Flocculation Settling Pilot Plant

Coagulation - flocculation - settling processes are generally used to separate colloids from water, as in this case natural settling speed is too slow to obtain a sufficient clarification. This plant enables to study the coagulation, flocculation and settling processes separately or simultaneously and it mainly consists of a stirred feed tank, of two tanks for flocculent and coagulant, of a stirred coagulation tank, of a stirred flocculation tank and of a plate settler. Process control, data acquisition and supervision are automatically carried out by a microprocessor controller and by a specific control and supervision software that enables the remote control of various operational parameters.

Model Sedimentation Tank

  • Usage:For College Labs
  • Operate Method:Manual
  • Material:Metal
  • Equipment Materials:SS
  • Supply Ability:1 Per Day

Aeration Unit

  • Usage:For College
  • Power:500 Watt (w)
  • Material:Metal
  • Voltage:220 Volt (v)
  • Equipment Materials:Brass
  • Display Type:Digital
  • Supply Ability:1 Per Day

Aerobic Digester

  • Equipment Materials:SS
  • Material:Metal
  • Weight:100-25000 Grams (g)
  • Usage:For University
  • Supply Ability:1 Per Day

Drainage and Seepage Tank

  • Supply Ability:1 Per Day
  • Voltage:220 Volt (v)
  • Equipment Materials:SS
  • Material:Metal
  • Power:500 Watt (w)
  • Usage:For Labs

Anaerobic Digester

  • Equipment Materials:SS
  • Material:Metal
  • Operate Method:Manual
  • Usage:For College
  • Supply Ability:1 Per Day

Flocculation Test Unit

  • Supply Ability:1 Per Day
  • Equipment Materials:SS
  • Material:Metal
  • Operate Method:Manual
  • Usage:For University

Sedimentation Studies Apparatus

  • Material:Metal
  • Equipment Materials:PU
  • Usage:For College Labs
  • Operate Method:Manual
  • Supply Ability:1 Per Day

Deep Bed Filter Column

  • Material:Metal
  • Equipment Materials:PU
  • Voltage:220 Volt (v)
  • Power:500 Watt (w)
  • Operate Method:Electric
  • Supply Ability:1 Per Day
X


Back to top